Details: first floor construction for new office building at daf taliparamba 15.56:dismantling old plaster or skirting raking out joints and cleaning the surface for plaster including disposal of to the dumping ground within 50 metres lead. 15.2.1:demolishing cement concrete manually / by mechanical means including disposal of material within 50 metres lead as per direction of engineer - in-charge.nominal concrete 1:3:6 or richer mix (i/c equivalent design mix) od846/2023-2024:demolishing laterite masonry manually/ by mechanical means including stacking of servicable material and disposal of unservicable material within 50 metres lead as per direction of engineer-in -charges: in cement mortar od1381/2023-2024:laterate masonry with depatment laterite in cement mortar 1:6 for super structure above plinth level up to floor two level including all cost of materials, labour charges etc. 50.6.7.2:laterate masonry with neatly dressed laterate stone of size 40x20x15cm or nearest size in cement mo
Sector: Agriculture Dept