Details: road 3.3 : excavation for road way in soil with dozer including cutting and pushing the earth to site of embankment upto a distance of 100 metres (average lead 50 metres), including trimming bottom and side slopes in accordance with requirements of lines, grades and cross sections. 3.17 : construction of embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded and compacted to meet requirement of table 300-2. 3.19.1 : loosening of the ground upto a level of 500 mm below the sub-grade level, watered, graded and compacted in layers to meet requirement of table 300-2 for compacting original ground supporting sub-grade construction. 3.15 : scarifying the existing bituminous road surface to a depth of 50 mm and disposal of scarified material with in all lifts and lead upto 1000 metres by mechanical means <br> 4.1.a.1 : construction of granular sub-base by providing graded material, mixing in a mechani
Sector: RDPR