Details: road maintenance 11.1.1.1:excavation for structures <br> earthwork in excavation for structures as per drawing and technical specifications clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material. <br> i. ordinary soil <br> (i) upto 3 m depth 11.4.1.1:providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications clause 802, 803, 1202 & 1203 <br> i. p.c.c grade m 10 <br> (i) nominal mix 1:3:6 11.4.2.1:providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications clause 802, 803, 1202 & 1203 <br>ii. p.c.c grade m 15 <br> (i) nominal mix (1:2.5:5) od176744/2024-2025:surface dressing of ground 15cm depth at all kind of soil 75.8.1:pr
Sector: RDPR