Details: appendix 15.7.4:demolishing brick work manually / by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of engineer-in-charge.in cement mortar 15.3:demolishing r.c.c. work manually / by mechanical means including stacking of steel bars and disposal of unserviceable material with in 50 metres lead as per direction of engineer -in-charge. 15.13.1:taking out doors, windows and clerestory window shutters (steel or wood ) including stacking within 50 metres lead:of area 3 sq. metes and below 15.2.1:demolishing cement concrete manually / by mechanical means including disposal of material within 50 metres lead as per direction of engineer - in-charge.nominal concrete 1:3:6 or richer mix (i/c equivalent design mix) 15.23.1:dismantling tile work in floors and roofs laid in cement mortar including stacking material within 50 metres lead.for thickness of tiles 10 mm to 25 mm 4.1.3:providing and laying in positi
Sector: PWD