Details: road improvement work 2.14.2.a:dismantling of flexible pavements dismantling of flexible pavements and disposal of dismantled materials upto a lead of 100 m, stacking serviceable and unserviceable materials separately as per technical specification clause 202 (ii) by mechanical means (a) bituminous courses 5.5.a.1a:modified macadam 50 mm thick using bitumen s-65 construction of macadam over prepared base by providing a layer of compacted crushed coarse aggregate using chips spreader with alternate applications of bituminous binder and key aggregates and rolling with a three wheel 80-100 kn static roller to achieve the desired degree of compaction as per technical specification clause 506. 5.5.b.2a:modified macadam 75 mm thick using bitumen s-65 construction of macadam over prepared base by providing a layer of compacted crushed coarse aggregate using chips spreader with alternate applications of bituminous binder and key aggregates and rolling with a three wheel 80-100 kn st
Sector: RDPR