Details: rennovation of gender resource center 15.13.1:taking out doors, windows and clerestory window shutters (steel or wood ) including stacking within 50 metres lead:of area 3 sq. metes and below od70908/2024-2025:demolishing laterite masonry in c m manually / mechanically ,including stacking of serviceable materials and disposal of un- serviceable materials with in 50 meters lead 15.3:demolishing r.c.c. work manually / by mechanical means including stacking of steel bars and disposal of unserviceable material with in 50 metres lead as per direction of engineer -in-charge. 5.9.3:centering and shuttering including strutting, etc. and removal of form for:suspended floors, roofs, landings, balconies and access platform 5.22.6:steel reinforcement for r.c.c work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelthermo - mechanically treated bars of grade fe-500d or more 5.3:reinforced cement concrete work in beams, suspended floors, roofs,
Sector: RDPR