Details: embankment protection 2.31:clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of up to a distance of 50 m outside the periphery of the area cleared od21196/2024-2025:ring bund type-i-putting up ring bund as per approved shape 2.5m bottom width, 1m top width using empty gunny/polythene bags filled with earth placed in 2 rows at 0.6m apart and filled in between with puddle clay to form bund for an average height 2.00m and maintaining the same leak proof including labour dismantling the bund after completion of the work etc. complete. 60.2.4:bailing out water using pump above 10hp and up to 20hp - bailing out water with engine and pump set above 10hp and up to 20hp, including conveyance to site and ,cost of fuel, lubrication oil and other stores, pay of staff etc complete 60.7.6:supplying and stacking granite stone 20 to 45 dm3 for dumping works- supplying at site
Sector: Irrigation