Details: construction of compound wall od92153/2024-2025:dismantling dr - dismanling , clearing away and carefully stacking materials useful for reuse for any thickness of walls in dr masonry including disposal of debris within a distance of 150m. od92155/2024-2025:rr with departmental. stone - random rubble masonry with hard stone in foundation and plinth including levelling up with cement concrete 1:6:12 (1 cement : 6 coarse sand : 12 graded stone aggregate 20 mm nominal size) up to plinth level with: cement mortar 1:6 (1 cement : 6 coarse sand) with out through bond stone. (modified item no.7.1.1 2.8.1:earth work in excavation by mechanical means (hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.all kinds of soil 4.1.8:providing and laying i
Sector: RDPR