Details: comfort station maintenance 4.3.1:centering and shuttering including strutting, propping etc. and removal of form work for:foundations, footings, bases for columns 4.1.3:providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - all work up to plinth level:1:2:4 (cement : 2 coarse sand (zone-iii) : 4 graded stone aggregate 20 mm nominal size) 13.1.1:12 mm cement plaster of mix:1:4 ( 1 cement : 4 fine sand) 50.18.9.14.1:providing and fixing pvc pipes, fittings including fixing the pipe with clamps at 1.00 m spacing. this includes jointing of pipes & fittings with one step pvc solvent cement and testing of joints complete as per direction of engineer-in-charge 32 mm dia 10 kgf/cm2 - external work- exposed on wall 50.18.9.16.1:providing and fixing pvc pipes, fittings including fixing the pipe with clamps at 1.00 m spacing. this includes jointing of pipes & fittings with one step pvc solvent cement and testing of joints comp
Sector: RDPR