Details: road work 55.4:supplying and stacking 36mm size hard broken stone in standard heaps for measurement. 55.8.a:filling up holes (cut and formed to regular shapes and all loose and defective materials removed) after supplying a prime coat of hot bitumen using 36mm departmental broken stone and compacting with power roller to get a compact surface. 4.12:providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the material with water at omc in mechanical mix plant carriage of mixed material by tipper to site, laying in uniform layers with paver in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density. 5.1.a:providing and applying primer coat with bitumen emulsion ( ss) on prepared surface of granular base including clearing of road surface and spraying primer at the rate of 0.70 - 1.0 kg/sqm using mechanical means. 5.2.a:providing and applying tack coat with bitumen
Sector: Road development