Details: work items earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom, ordinary soil - by manual or mechanical means - (depth up to 1.50 m) earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom, ordinary soil - by manual or mechanical means - (depth up to 3m) filling with available earth at site ( excluding rock) in embankment in layers ( each layer should not exceed 15 cm), top layer of filling shall be done with earth having total minimum compacted thickness 30 cm or as decided by engineer - in- charge, including compacting each layer by rolling / ramming and watering, all complete as per drawing and direction of engineer - in-charge
Sector: Cooperative Federation