Details: 1 appendix - a - surfacing work 55.4:supplying and stacking 36mm size hard broken stone in standard heaps for measurement. 55.2:supplying and stacking 12mm hard blue granite broken stone in standard heaps for measurement(irc 3.2.1.a) 55.8.a:filling up holes (cut and formed to regular shapes and all loose and defective materials removed) after supplying a prime coat of hot bitumen using 36mm departmental broken stone and compacting with power roller to get a compact surface. 55.9.a:filling up holes (cut and formed to regular shapes and all loose and defective materials removed) after supplying a prime coat of hot bitumen using 12mm departmental broken stone and compacting with power roller to get a compact surface. 5.2.a:providing and applying tack coat with bitumen emulsion( rs) using emulsion pressure distributor at the rate of 0.20 - 0.30 kg per sqm on the prepared bituminous surface cleaned with mechanical broom. od92827/2024-2025:providing, laying and rolling of close graded pr
Sector: Road development