Details: pump house 2.8.1:earth work in excavation by mechanical means (hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.all kinds of soil 7.1.1:random rubble masonry with hard stone in foundation and plinth including levelling up with cement concrete 1:6:12 (1 cement : 6 coarse sand : 12 graded stone aggregate 20 mm nominal size) up to plinth level with:cement mortar 1:6 (1 cement : 6 coarse sand) od263311/2023-2024:laterite neatly dressed stones of size 35x20x20cm in cement mortar 1:6 forfoundation and basemen or nearest size in cement mortar 1:6 for foundation and basement including all costof materials, labour charges etc od283329/2023-2024:laterate masonry with neatly dressed laterate stone of size 35x20x20 cm or nearest size in cement mort
Sector: RDPR