Details: annual maintenance 2.31:clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of up to a distance of 50 m outside the periphery of the area cleared 2.6.1:earth work in excavation by mechanical means (hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.all kinds of soil 7.1.1:random rubble masonry with hard stone in foundation and plinth including levelling up with cement concrete 1:6:12 (1 cement : 6 coarse sand : 12 graded stone aggregate 20 mm nominal size) up to plinth level with:cement mortar 1:6 (1 cement : 6 coarse sand) 13.1.1:12 mm cement plaster of mix:1:4 ( 1 cement : 4 fine sand) 14.1.1:repairs to plaster of thickness 12 mm to 20 mm in patches of area 2.5 sq meters and
Sector: Irrigation