Details: estimate 15.56:dismantling old plaster or skirting raking out joints and cleaning the surface for plaster including disposal of to the dumping ground within 50 metres lead. 15.41:dismantling cement asbestos or other hard board ceiling or partition walls including stacking of serviceable materials and disposal of unserviceable materials within 50 metres lead. 15.2.1:demolishing cement concrete manually / by mechanical means including disposal of material within 50 metres lead as per direction of engineer - in-charge.nominal concrete 1:3:6 or richer mix (i/c equivalent design mix) 15.14.1:dismantling wood work in frames, trusses, purlins and rafters up to 10 metres span and 5 metres height including stacking the material within 50 metres lead:of sectional area 40 square centimetres and above 15.14.2:dismantling wood work in frames, trusses, purlins and rafters up to 10 metres span and 5 metres height including stacking the material within 50 metres lead:of sectional area below 40 squar
Sector: PWD