Details: lsgd road restoration works -bt roads 3.5.3:excavation in soil using hydraulic excavator and tippers with disposal upto 1000 m excavation for roadwork in soil with hydraulic excavator of 0.9 bucket capacity including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross-sections, and transporting to the embankment location with a lift upto 1.5 m and lead upto 1000 m as per technical specification clause 302.3 4.1.a.1:granular sub-base with well graded material (table 400.1) (a) by mix in place method construction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at omc, and compacting with smooth wheel roller to achieve the desired density, complete as per technical specification clause 401. (i) for grading i material 4.9:wet mix macadam providing, laying, spreading and compacting graded stone
Sector: Water supply and Sewerage