Details: construction of drain and cover slab 2.5.2.a:dismantling of structures dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including t&p and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 m as per technical specification clause 202.(ii) by mechanical means (a) cement concrete 3.5.2:excavation in soil with dozer with lead upto 100 m excavation for roadway in soil by mechanical means including cutting and pushing the earth to site of embankment upto a distance of 100 m, including trimming bottom and side slopes in accordance with requirements of lines, grades and cross-sections. od66166/2024-2025:filling with quarry muck <br> filling up low lying and water logged areas with localmaterial/ quarry muck, spreading in layers, leveling the top at site
Sector: RDPR