Details: bridge construction od42673/2023-2024:bailing out water using 5hp pump- bailing out water with 5hp engine and pump setincluding conveyance to site and ,cost of fuel, lubrication oil and other stores, pay of staff etccomplete od42674/2023-2024: :ring bund type ii putting up ring bund with earth fille gunny bags of top width 1.0mbottom width 2.0m height 2.0 m side and filling in between with earth to form ring bund and maintaining thesame leak proof till the completion of the work and clearing the site by dismantling the bund aftercompletion of the work.etc.complete 11.1.1.1:excavation for structures <br> earthwork in excavation for structures as per drawing and technical specifications clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material. <br> i. ordinary soil <br> (i) upto 3 m
Sector: RDPR