Details: ch. 0 km to ch.8.589km 2.32:clearing grass and removal of the up to a distance of 50 m outside the periphery of the area cleared. 2.6.1:earth work in excavation by mechanical means (hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.all kinds of soil 2.33.2:felling trees of the girth (measured at a height of 1 m above ground level) including cutting of trunks and branches, removing the roots and stacking of serviceable material and disposal of unserviceable material.beyound 60 cm girth up to and including 120 cm girth 2.33.1:felling trees of the girth (measured at a height of 1 m above ground level) including cutting of trunks and branches, removing the roots and stacking of serviceable material and disposal of unserviceable material.beyound 30 cm girth up to and including 60 cm girth od756/2024-
Sector: Irrigation