Details: st thomas bylane od45106/2024-2025:filling with quarry muck filling up low laying and water logged areas with local materials/quarry muck, spreading in layers, leveling the top at site and consolidation by ramming etc complete for improving the cbr value of the subgrade od45107/2024-2025:(od from mord 6.7.1) interlocking concrete block pavement. providing and laying interlocking concrete block pavements having thickness 80mm as per drawings and technical specifications. clause 1504 75.8.1.1:providing plain/reinforced concrete(1 cement:2 fine aggregate: 4 course aggregate) forsubstructure as per drawings and technical specifications clause 802, 803, 1202 & 1203as required including compaction, finishing and tamping etc .complete. max. size ofcourse aggregate not exceeding 25mm , mixed in concrete mixer etc complete as perspecification(i) nominal mix (1:2:4)
Sector: RDPR