Details: appendix- a- cost of materials 100.98.236:supply of pvc pipe, 10kg/cm2, 90mm dia. appendix-b-working charges 100.59.1:cutting the bituminous / concrete roads with cutting machine for a minimum depth of 200mm along the sides of proposed alignment of the pipe to be laid without causing any damage to other utilities, including the charges for hire and conveyance of tools and plant, cost of consumables and charges for lighting, watching, ribbon fencing, caution boards, traffic diversion, and as per the direction of departmental officers etc. complete, before carrying out the demolition of bituminous / concrete road by mechanical means and carrying out the excavation. od2987/2024-2025:dismantling manually / by mechanical means including disposal of unserviceable material within 50 metres lead as per direction of engineer -in-charge: bituminous road 100.1.1:excavating trenches of required width for pipes, cables, etc., including excavation for sockets, and dressing of sides, ramming of botto
Sector: Water supply and Sewerage