Details: road 3.2 : preparation of foundation for embankmentscarifying existing bituminous surface to a depth of 150 mm by mechanical meansscarifying the existing bituminous road surface to a depth of 150 mm and disposal of scarified material with a lift upto 3 m and lead upto 1000 m as per technical specification clause 301.4. 3.5.2 : excavation in soil with dozer with lead upto 100 mexcavation for roadway in soil by mechanical means including cutting and pushing the earth to site of embankment upto a distance of 100 m, including trimming bottom and side slopes in accordance with requirements of lines, grades and cross-sections. 4.1.a.1 : granular sub-base with well graded material (table 400.1) (a) by mix in place method construction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at omc, and compacting with smooth wheel roller to achieve the desired density, complet
Sector: Power Sector