Details: road od93081/2024-2025:filling with contractors own earth (excluding rock) in open areas in layers not exceeding 20cm in depth , consolidating each deposited layer by ramming and watering, lead up to 50m and lift up to 1.5m as per direction of site enginner od93078/2024-2025:filling up low laying and water logged areas with local material/quarry muck spreading in layers, levelling the top at site and consolidation by ramming etc. complete for improving the cbr value of subgrade (mord) od93079/2024-2025:providing plain cement concrete for road work cc 1:2:4 (1cement:2 fine aggregate : 4 course aggregate)laid to required and camber in panels (@3m c/c) as required including compaction, finishing and tamping etc.. complete. max size of course aggregate not exceeding 25mm, mixed in concrete mixer etc.. complete as per specification od93080/2024-2025:providing and fixing 18mm thick gang saw cut mirror polished , premolded and prepolished machine cut for kitchen platform , vindow sills a
Sector: RDPR