Details: chipping plastering dismantling old/weak plaster over masonry or skirting, raking out joints and cleaning the surface for plaster including scaffolding upto 5 mtr height,tools and takles and disposal of to the dumping ground within 1kms lead,at all heights demolishing rcc demolishing r.c.c. work manually / by mechanical means including stacking of steel bars and disposal of unserviceable material with in 50 metres lead as per direction of engineer -in-charge. fixing steel drilling suitable holes in reinforced or plain cement concrete with power driven drill machine to a minimum depth of 100mm upto 200mm in rcc beams, lintels, columns and slabs to introduce steel bars for sunshades/balconies including fixing the steel bars in position using epoxy resin anchor grout of approved make including scaffolding upto 4 m height but excluding the cost of reinforcement, all complete as per direction of engineer-in-charge.upto and including 12mm dia. steel work for pedestal steel reinforcement
Sector: Mining