Details: clearing the scrub jungle, dense bushes and uprooting to full depth, disposing of the same away from the site including levelling the site to the original ground level etc complete in all respects. earth work in surface excavation not exceeding 20 cm in depth as top soil excavation, getting out the excavated earth and stacking them at the places within the site as directed. the rate shall shall include for uprooting the small plants and grass and disposal them away from the site etc complete in all respects as directed by engineer-in-charge earth work excavation for foundation in sdr soils and sub soils not requiring blasting to the required depth as may be directed including dense soil, cemented silty grey and brownish grey soil for mass excavation mass excavation such as basement, ug sump, stp, footings of columns and any other structure, including manual / mechanical excavation and dressing of sides and ramming of bottom with all leads and for the following lifts, shoring, strutting
Sector: Information Technology