Details: 1.providing double scaffolding arrangement around the existing over head tank to carry out repair/improvement works to a height of 28.0m and dia of 10m (approx) for outer and inner respectively by using steel pipes of required diameter or by casuarina poles, including providing necessary horizontal and vertical members, tie members, bracings etc., all round and platforms at various level with adquate strength including removing the scaffolding with platform after completion of repair/improvement works all as per relevant specification and all as directed at site including all labour, materials, tools, equipments, coir, transport, fuel, etc., complete. note:1) scaffolding will be measured only one time for entire repair/improvements (length x height)2) 75% of the payment may be released after erecting of scaffolding in all respects.
Sector: Harbor