Description: LABOUR CONTRACT FOR BOILER JET CLEANING Name of Work Labour contract of Boiler Jet cleaning
Details: Boiler Tube internal cleaning by Hydro jet cleaning method (1) Internal cleaning of entire tubes a.WIL Boiler details - 1 No.:Make : WILCapacity : 35MT/HrPressure : 45 Kg/cm2 Temperature : 440 (+) or (-) 15 centigrade.Type : Water tube boilerTotal no. of tubes: 1133 nos. (Air Preheater Tube, Main bank, screen, rear wall, side Wall roof, down comer and super heater coil tubes) Lumpsum Rate b.KCP Boiler details – 2 Nos. :Make : KCPCapacity : 20MT/HrPressure : 21 Kg/cm2 Temperature : 340 (+) or (-) 15 centigrade.Type : Water tube boilerTotal no of tubes : 2 x 610 = 1220 nos. (Air Preheater Tube, Main bank, screen, rear wall, side wall roof, down comer and super heater coil tubes) Lumpsum rate
Sector: Sugar