Details: earth work excavation for foundation in all soils and sub soil to full depth sides of foundation.as per ss 20b construction of granular sub base by providing well graded material spreading in uniform layers with motor grader on prepared surface mixing by mix in place method with rotovator at omc and compacting with three wheel 80-100 kn capacity and finished in accordance with the requirements of the specification and thickness as per approved plans or as directed by the engineer as per clause 401 of mord revision i(mix -in - place method) c.c. 1:4:8. mix using 20mm iss hbg metal including cost and conveyance and all other labour charges etc,complete. c.c. 1:2:4. mix using 20mm hbg metal including cost and conveyance and all other labour charges & centering for the side surfaces etc.complete. supply and erecting centering for sides and soffits including cost and conveyance and all other labour chargesetc.complete. providing and laying of interlocking
Sector: RDPR