Details: dismantling the plain cement concrete and clearing away from the site as directed by the departmental officers. supplying and filling in m sand layers not exceeding 150 mm thick including cost and conveyance of all materials and all the labour charges etc, complete cement concrete 1:5:10 (one cement five sand and ten aggregates) using 40 mm guage hard broken granite chips including watering and consolidation etc,. complete. plain cement concrete 1:2:4 (one cement two sand and four aggregates) using 20 mm thick, gauge hard broken stone jelly including laying, finishing and the top rubbed smooth with power trawl, thread lining, curing, etc,. complete complying with standard specification. earth work excavation for foundation in soils and sub soils full depth as may be directed except in rock requiring blasting but inclusive of shoring and strutting and balling out water wherever necessary refilling the sides of foundation with excavated earth in layers of not more than 15 cm thick well r
Sector: Logistics and warehouses