Description: Comprehensive Annual Maintenance Contract of Sewage Treatment Plant STP 150 KLD Water Treatment Plant with RO Purification WTP 80KLD and Drinking Water RO UV Ozonized plant 2 nos of 250 LPH including existing faults rectification work Name of Work Comprehensive Annual Maintenance Contract of Sewage Treatment Plant STP 150 KLD Water Treatment Plant with RO Purification WTP 80KLD and Drinking Water RO UV Ozonized Plant 2 No s x 250 LPH installed at Koyambedu Administrative Building and Koyambedu Depot Premises including Existing Faults Rectification Works at respective plants
Details: Comprehensive Annual Maintenance Contract Charges CAMC of Sewage Treatment Plant Capacity:150 KLD CAMC of Water Treatment Plant with RO PurificationCapacity: 80 KLD CAMC of Drinking Water RO+UV+Ozonized PLantCapacity: 2 Nos of 250 LPH Capacity Fault Rectification Works - STP Plant Servicing of PLC Panel Servicing of UF air blower & replacing oil indicator Servicing of STP air blower (SBR) Replacing of Pressure Gauges Replacing of UF Permeate Electro Magnetic Flow Meter Replacing of New Filter Media in Multi Grade Filter Replacing of New Filter Media & Carbon in ACF Filter Replacing of Diffusers & Air Hoses in SBR Tanks - Tank 1 & Tank 2 Painting of Filter Vessels Chemical Calening of UF Membranes Repairing the fine screen filter; If not Repairable, Replacing the filter is under contractor’s scope Servicing of UF Feed Pump including rewinding Servicing of the Sludge Transfer Pumps including rewinding and rectification Replacement / Rectification of Air Blower Discharge pressure gauge
Sector: Metro rail