Description: WC for Erection Dismant Maintenance works in T Nagar Division Name of Work Erection dismantling of DT Structure Pillar Laying of HT LT cable for improvement extension DCW works and allied works towards attending HT cable fault of 3x300 and 3x120 sqmm LT cable fault of 4x240 4x120 service cable fault of 4x25 and 2x16sqmm Maintenance of DT Maintenance of DT Structure and Pillar Maintenance in respect of T Nagar division for period of One year which ever is earlier
Details: ERECTION OF DISTRIBUTION TRANSFORMER STRUCTURE Excavation of Structure Pole Pit 2x3x1/6 th of height Erection of 9.14 M RCC/9.0 Mtr PSC /RSJ pole Transporting of 9.14 m poles from Road side to pole pit Structure pole mass Concreting and coping 0.6x0.6x1.65 for DP structure Including cost of materials and cement. Erection of structure materials complete such as top channel, seating channel, belting angle, cross bracing. DPDC channel, T.I. Fitting etc., in complete. Erection of HG fuse set with transport Erection of 11 KV AB switch complete set with transport Transformer structure grounding and earthing of structure complete including excavtion of earth pit and erection of earth pipe with salt, coal and earth refiling etc., complete including cost of coal and salt Erection of Aluminium bus bar pipe complete for H.T. Bus bar arrangements for DP Structure For Triple Pole and four pole structure Erection of H.T. jumpering in DP structure complete Erection of H.T. LAS Erection of L.T.
Sector: Power Sector