Description: PROVISION OF PERIMETER ROAD AND SECURITY LIGHT AT AFS JALAHALLI PHASE I Name of Work PROVISION OF PERIMETER ROAD AND SECURITY LIGHT AT AFS JALAHALLI PHASE I
Details: Schedule 'A' Part - I (B/R Works)Earth work in excavation over areas by mechanical in any kind of soil (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5m complete all as specified and as directed. Earth work in excavation by mechanical in foundation trenches over any kind of soil (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m complete all as specified and as directed.(for kerb stone) Earth work in excavation over areas by mechanical in ordinary rock (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5m complete all as specified and as directed. Earth work in excavation by mechanical in foundation
Sector: Defense