Description: Restoration of BT surface using CMP with Paver finisher at Name of Work Restoration of BT surface using CMP with Paver finisher at Usman Ali Nagar 086064R2856 285 x 4 50 Ushman ali Nagar 3rd Cross 086064R2860 66 x 4 15 Ushman ali Nagar 4th street 2nd Cross 086064R2861 56 x 4 15 Ushman ali Nagar Cross Street 086064R2863 30 x4 15 Ushman ali Nagar Extension 4th Street 086064R2868 38 x 4 15 Ushman ali Nagar Extension 3rd Street 086064R2869 35 x 4 15 Ushman ali Nagar Extension 2nd Street 086064R2870 86 x 4 15 Ushman ali Nagar 1st street 086064R2871 75 x 4 15 Ushman ali Nagar 1st street 1st Cross 086064R2872 30 x 4 15 Mannai Narayanasamy Street 086064R2716 160 x 4 50 Mahalakshmi Nagar II nd Street 086064R2697 146 x 4 50 Mahalakshmi Nagar III rd Street 086064R2699 267 x 4 50 Mahalakshmi Nagar Ist Street 086064R2701 121 x 4 50 Mahalakshmi nagar 1st cross 086064R2717 116 x 4 50 Wireless Road Sheshayee Nagar 086064R2607 465 x 6 00 Wireless road extension east 086064R2702 119 x 6 00 Palani nagar 3rd main road 1st cross 086064R2564 46 x 4 50 Palani Nagar II nd Street 086064R2565 117 x 4 50 Palani Nagar I st Street 086064R2566 235 x 4 50 Palani nagar 1st main road Ist cross street 086064R2567 93 x 4 50 Palani nagar 1st main road Ist cross street 086064R2567 125 x 4 50 Railway station road 4th cross 086064R2708 55 x 4 00 Railway station road 3rd cross 086064R2709 72 x 4 00 Railway station road 2nd cross 086064R2712 107 x 4 00 Railway station road 1st cross 086064R2713 150 x 4 00 Railway station north 1st cross 086064R2714 103 x 4 00 Pandiyan Nagar Kurinji Nagar 086064R2622 126 x 4 00 Kaveri Nagar 2nd main Road 086065R2189 412 x 4 70 Kaveri Nagar 1 st Cross Street 086065R2190 236 x 5 00 Kaveri Nagar 2nd Cross Street 086065R2191 186 x 5 00 Kaveri Nagar 3rd Cross Street 086065R2192 287 x 5 00 Star Nagar 086065S0862 420 x 4 50 Thangaiyanagar Extension 086064R2867 30 x 4 00 In Ward No 64 65
Details: Providing and laying tack coat of 2kgs/10 sqm over the BT surface treated with binder using 2 kgs of bituminous Emulsion (RS) for 10square meter area including cost of bituminous binder, including labour charges for applying the required quantity of bituminous binder as tack coat manually etc., complete as per 503 of MORTH Specifications Providing and laying 50mm consolidated thick Dense Bituminous Macadam using 0.24cum of 26.50-13.20mm, 0.25 cum of 13.20-2.36mm and 0.23 cum of 2.36mm & below and with 53.20Kgs of VG30/VG40 bitumen for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing the min. required temperature in central hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks to worksite, spreading the mix to uniform thickness of 50mm with paver to the specified grades and cross sections and compacted by Vibratory / Pneumatic Roller to the required density etc., includi
Sector: Municipality