Description: Development works for promotion of tourism at Dhanushkodi Lighthouse Name of Work Development works for promotion of tourism at Dhanushkodi Lighthouse
Details: PART-A (CIVIL WORK) :Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. Providing and laying of plain cement concrete 1:3:6 (1 Cement : 3 coarse sand (zone-III) derived from natural sources : 6 graded stone aggregate 20 mm nominal size derived from natural sources) Including mixing laying, curing, consolidation excluding side shuttering etc., complete, supply of all materials, labours, tools & plants and all other charges etc., complete. Brick work with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in foundation and plinth in:Cement mortar 1:4 (1 cement : 4 coarse sand) Foundation & Plinth Reinforced cement concrete work in beams, suspended floors, roofs having up
Sector: Harbor