Description: Construction of Infrastructure Facility for HRS in HRS Campus Guindy Chennai Name of Work Construction of Infrastructure Facility For HRS in HRS Campus Guindy Chennai
Details: Earth work open excavation in all soils and sub-soils and to full depth as may be directed except in rock requiring blasting inclusive of shoring shuttering, bailing out water wherever necessary and depositing the excavated earth with a lead of 10 mts. within the compound in places shown by the departmental officers and clearing and levelling the site, etc., complete complying with standard specification. Earth work excavation for foundation in all soils and sub-soils and to full depth as may be directed except in hard rock requiring blasting inclusive of shoring shuttering, bailing out water wherever necessary refilling the sides of foundation with excavated soil other than sand in layers of 15cm thick well rammed and completed, and depositing the surplus earth within the compound in places shown by the departmental officers with an initial lead of 10 mts and initial lift of 2 mts. and clearing and levelling the site, etc., complete complying with standard specification. Note: The co
Sector: Industry Development