Description: ICHP -Clearing the slided and spilled coal along the walkways over, below deck sheets, between the track rails and outside the track rails both north and south sides of Stacker-II and Reclaimer-II machine travel path in Conveyor-54.--Name of Work: <ICHP -Clearing the slided and spilled coal along the walkways over/ below deck sheets, between the track rails and outside the track rails both north & south sides of Stacker-II and Reclaimer-II machine travel path in Conveyor-54 >
Details: Clearing of slided and spilled coal in Stacker-II and Reclaimer-II machines Travel path in Conveyor-54 Charges for clearing the spilled and slided coal along the walkway over / below deck sheets, between the track rails and outside track rails both North & South sides of Stacker – II & Reclaimer – II machines travel path of 420m length in conveyor – 54 including hire charges for T&P’s, and all leads and lifts etc complete.
Sector: Power Sector