Description: Improvement estimate for Strengthening of conductor from ACSR 7/3.35 Sq. mm into ACSR 7/4.09 Sq. mm in 11KV Seruvagi feeder under UDAY scheme Part I, Part II and HT link line work in respect of JE ,O M,Melalathur section.--Name of Work : (I) Improvement estimate for Strengthening of conductor from ACSR 7/3.35 Sq. mm into ACSR 7/4.09 Sq. mm in 11KV Seruvagi feeder under UDAY scheme ( Part I ) in respect of JE/O&M/Melalathur section. (II)Improvement estimate for Strengthening of conductor from ACSR 7/3.35 Sq. mm into ACSR 7/4.09 Sq. mm in 11KV Seruvagi feeder under UDAY scheme( Part II ) in respect of JE/O&M/Melalathur section. (III) Improvement estimate for HT 11 KV Veppur feeder fed from 110/11 KV Vadakathi patti SS , HT link line work for Goodanagaram SS-VIII to Goodanagaram SS V ( Under UDAY Scheme) in respect of JE/O&M/Melalathur section of AEE/O&M/Urban/Gudiyattam sub division in Gudiyattam division of Tirupattur EDC.
Details: Excavation of PSC pole 9.0 mtr pole pit by uing JCB or manual Loading of PSC pole 9.0mtr length UnLoading of PSC pole 9.0mtr length Erection of PSC pole 9.0 mtr length pole by using Crane / Manual Transportation of all types and sizes of poles and other associated materials from road side to pole pit and vice versa upto 0.50 KM Transportation of all types and sizes of poles and other associated materials from road side to pole pit and vice versa upto 5 KM Concreting with 1:4:8 mix using 40 mm Jelly including curing ( Material + Labour).(II) Sleeve Concreting. Earthing of poles with GI wires 4 or 6 SWG by coil earthing. Loading / Unloading of line materials Transporting of Distribution Transformer/ Line materials from stores to office/site upto 10 KM distance by engaging 1 Ton capacity Minidor (Lorry) Fixing of 11 KV Tapping Channel X arms Provision of guarding with two numbers earth pits excluding stay set erection by using flat guarding with earth pit Fixing of 11 KV 'V' X a
Sector: Power Sector