Description: PACKAGE (A,B,C,D and E)
Details: Name of work :Package (A) Shifting of Existing 11 KV HT/LT OH lines and Double Pole Structure along with Distribution Transformers from Km 35/8 -36/0 in respect of Irungattukottai section of Sriperumbudur Division in Chengalpattu EDC TANGEDCO for the main work of Widening existing 4 lane to 6 lane and Improvements from Km 34/0 (Irungattukottai) to Km 37/0 (Sriperumbudur Toll plaza ) of NH48 (Old NH-4) Chennai- Bangalore Section 3.00 Km Stretch(B) Shifting of Existing 11 KV HT/LT OH lines and Double Pole Structure along with Distribution Transformers from Km 36/0-36/4 in respect of Irungattukottai section of Sriperumbudur Division in Chengalpattu EDC TANGEDCO for the main work of Widening existing 4 lane to 6 lane and Improvements from Km 34/0 (Irungattukottai) to Km 37/0 (Sriperumbudur Toll plaza ) of NH48 (Old NH-4) Chennai- Bangalore Section 3.00 Km Stretch(C) Shifting of Existing 11 KV HT/LT OH lines and Double Pole Structure along with 1KV Switching arrangement
Sector: Road development