Description: Improvement of Water Supply System in Kannivadi Town Panchayat Name of Work Improvement of Water Supply Scheme in Kannivadi Town Panchayat Tiruppur
Details: Earth work excavation for foundation (for narrow excavation) in all soils and sub-soils and to full depth as may be directed except in rock requiring blasting inclusive of shoring shuttering, bailing out water wherever necessary and depositing the surplus earth within the compound in places shown by the departmental officers with an initial lead of 10 mts and initial lift of 2 mts. and clearing and levelling the site, etc., complete complying with standard specification.In hard stiff clay, stiff black cotton, hard red earth, shales, murrams, gravel, stoneyearth and earth mixed with small sized bouldersFor First depth of 0 to 2 m SDR - (Not Requiring Blasting) Earth work excavating and depositing on bank with initial lead of 10 m & initial lift of 2m in Soft disintegrated rock, laterite, soft rock or kankar, not requiring blastingFor 2nd depth of 2 m to 3 m Earthwork excavation and depositing on bank with an initial lead of 10m and initial lift of 2 m in trenches in other than loose
Sector: RDPR