Details: strengthening of the road from govindamangalam - melakarai 0/0-0/680 clearing the scrub jungle including all labour charges for burrying and burning etc., picking the existing b.t surface including all labour charges etc complete earthwork in all soils except hard rock requiring blasting and conveying for formation of bund with lead of 0 to 100 metre deploying earth moving machineries and tippers including benching, formation fo bunds, breaking clods, sectioning etc., compelte. km 0/0 -0/680 providing and laying gravel soling to compacted thick including cost & conveyance of gravel from approved sources to work site including labour for spreading, water and compacting by power roller to achieve the required proctor density at 100% compaction at optimum moisture content and hire and fuel charges for power roller, water sprinkler and all other incdidental charges such as traffic barricading and providing danger lights etc., complete. km 0/0 -0/680 providing and laying 75mm compacted t
Sector: RDPR