Details: construction of community hall near anthoniyarpuram madhakoil @ komal panchayat earthwork excavation for foundation in all soils and sub-soils to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring, strutting and baling out water wherever necessary and refilling the sides of foundation with excavated earth in layers of not more than 15cm thick well rammed and consolidated and depositing the surplus earth in all places shown by the departmental officers with inital leads and lifts, etc. including leveling the sites complete complying with standard specifications and as directed. in sand or other loose soil, wet sand not under water, silt, light black cotton soil, sandy loams and ordinary soil. tnbp ss no 20b 23 & 24 i depth (g o no. 26/27.02.2014) supplying and filling in foundation and basement with filling sand in layers not more than 15cm thick well rammed, watered and compacted complete complying with standard specification. cement concrete
Sector: RDPR