Details: earth work excavation for foundation in all soils and sub - soils to full depth etc. complete as per ss 20b cement concrete 1:4:8 for foundation using 40mm hbg metal etc. incl all charges .complete. (75.31.2) rein forced cement concrete 11.5:3 mix using 20mm hbg metal for foundation and basement etc. complete.(75.40.10) supplying and erecting centering of sides and soffits including supports and strutting up to 3.29m height for plane surfaces in all floors etc. complete. for upto basement for above basement supplying and fabrication of steel including cost and conveyance and cutting, bending, tying and placing in position b.w in cm 1:5 mix using new country bricks incl all cost and conveyence incl all charges ( 75.31.10 ) plastering with cm 1:3, 10mm thick.in all floors including curing etc., complete complying with standard specifications and as directed by the departmental officers. rate for 10m2.(75.31.22) plastering with cm 1:5, 12mm thick.in all floors including curing etc., com
Sector: RDPR