Details: fabrication, supply and of id fan 1b casing top portion. work involves cutting and dismantling of existing eroded and damaged fan casing top portion, fabrication of new fan casing top portion with casing liner plates as original, of new fabricated casing by leading, lifting, positioning and matching with the existing bottom casing. including cost of consumables, t&p’s and transportation from work shop to nctps-i site, transit insurance., etc., (as per the job specification enclosed)
Sector: Power Sector