Details: earthwork excavation for foundation in all soils and sub-soils to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring, strutting and baling out water wherever necessary and refilling the sides of foundation with excavated earth in layers of not more than 15cm thick well rammed and consolidated and depositing the surplus earth in all places shown by the departmental officers with inital leads and lifts, etc. including leveling the sites complete complying with standard specifications and as directed. in sand or other loose soil, wet sand not under water, silt, light black cotton soil, sandy loams and ordinary soil. tnbp ss no 20b 23 & 24 cement concrete 1:4:8 mix (one cement five sand and ten hard broken stone) using 40mm isshbg metal for foundation, flooring and rendering the top rough to take floor finish including watering wherever necessary and laid in layers not more than 15cm thick compacting etc. completeas per specification and as direce
Sector: RDPR