Details: earth work excavation for foundation (for narrow excavation) in all soils and sub-soils and to full depth as may be directed except in rock requiring blasting inclusive of shoring shuttering, bailing out water including refilling wherever necessary and depositing the surplus earth within the compound in places shown by the departmental officers with an initial lead of 10 mts and initial lift of 2 mts. and clearing and levelling the site, etc., complete complying with standard specification. first depth footing second depth footing third depth footing fourth depth footing refilling with excavated earth in layers of 30 cm watered well rammed and consolidatred conforming to standard specification including labour charges as directed by engineer in charge supplying and filling the basement with good earth filling in layers of not more than 15cm thick well rammed watered and compacted - etc., complete complying with standard specification. supplying and filling the basement withra
Sector: RDPR