Details: earth work excavation for foundation in hard stiff clay, stiff black cotton, hard red earth, shales, murram, gravel, stoney earth and earth mixed with small size boulders, sand, silt or other loose soil and to full depth as may be directed except in hardrock reqiring blasting inclusive of shoring shuttering and bailing out water wherever necessary refilling the sides of foundation with excavated soil other than sand in layers of 15cm thick well rammed and completed depositing the surplus excavated soil with in the compound in places shown by the departmental officrs with initial lead and lifts and cleaning, levelling, the site etc., complete as per ss 20b for foundation cement concrete 1:4:8 (one cement, four fine aggregate and eight course aggregate) mix using 40mm hbg iss metal from approved quarry including cost and conveyance of all materials to site and labour charges, including dewatering if found necessary and laid in layers of not more than 15cm thick and compacted etc., comple
Sector: RDPR