Details: construction of cremation shed @ m.puthupakkam east colony in m.puthupakkam panchayat earth work excavation for foundation in all clauses of soils and sub soils to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting and boiling out water whenever necessary et complete complying with. supplying and filling in foundation and basement with good sand in layers not more 15 cm thick including ramming, watering and compacting etc.complete complying to standard specification filling in the basement with the gravel including cost and conveyance to the site and all labour charges for filling as per standard specifications cement concrete 1:4:8 mix using 40 mm hbg metal for foundaion including watering wherever necessary and laid in layers of not more than 15cm thick. compacting etc., complete complying with standard specifications and as directed. cement concrete 1:2:4 mix using 20mm iss metal including cost and conveyance of all materials
Sector: RDPR