Details: civil works dismantling & removing the existing reinforced cement concrete work etc., by using required mechinaries including stacking of steel bars and disposal of unserviceable material within 50m lead, labour charges, as per direction of engineer in charge. carting away surplus excavated earth available with in the campus is to be carted to a lead of within 25 km from site. the rate shall include loading into the tipper/ lorry transporting and unloading, leveling and the earth scooped by bulldozers grading etc.,complete with all respects complying with relevant standard specification, as directed by the departmental officers. rate to include materials, loading, unloading, transportation, plant and machinery, hire and fuel charges for tools and plants and other incidental charges, royalties, seignorage and taking statutory approvals as necessary to carry out the work as complete with all respects complying with relevant standard specification, as directed by the engineer-in-charge.
Sector: Urban Authority