Details: vadavanpatti village road via drama stage km0/0 - 0/45 existing bt surface picking including cost and conveyance of all laboue charges to site etc., complete. earth work excavation and depositing on bank within initial lead of 10m & initial lift of 2m in hard stiff clay, stiff black cotton, hard red earth, shales, murram, gravel, stoney earth and earth mixed with small size boulders ss .20.a providing and laying gravel soling to compacted thick including cost & conveyance of gravel from approved sources to work site including labour for spreading, water and compacting by power roller to achieve the required proctor density at 100% compaction at optimum moisture content and hire and fuel charges for power roller, water sprinkler and all other incdidental charges such as traffic barricading and providing danger lights etc., complete. providing and laying spreading and compacting graded stone aggregate to wet mix macadam(wmm) specification including premixing the material with water a
Sector: RDPR