Description: Olakkur 15th CFC Tide BP 25 26 Package 1 Name of Work CONSTRUCTION OF BUILDING FOR BPHU BUILDING AT OLAKKUR PANCHAYAT IN OLAKKUR BLOCK
Details: CONSTRUCTION OF BUILDING FOR BPHU BUILDING AT OLAKKUR PANCHAYAT IN OLAKKUR BLOCK Clearing light jungle vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of up to a distance of 50 m outside the periphery of the area cleared. Earth work excavation for foundation in all soils and sub soils to full depth etc., ordinary soil complete Filling with fine carted sand including cost and conveyence of all charges etc., Cement concrete 1 : 4 : 8 mix using 40mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed Refilling the approved good quality earth in plinths, area development etc. wherever specified in layers is not exceeding 200 mm thick, with available earth at site. Supplying and filling in foundations and basement with filling M sand in layers not exceeding 15 cm.
Sector: RDPR